Friday, May 22, 2009

Tree plantings


The first trees are in at 3 tee box. Four aspens were planted today along the slope between the green and tee boxes. Five more will be delivered on Tuesday, for a total of nine along the slope.
If Mother Nature cooperates with us next week the plan is to finish plantings, pour concrete curbing, install cart path material and by Saturday finish with sod.
The new irrigation and communication is complete on #3. Saturday LUI will continue to install irrigation to the 2nd green and approach.
This week, irrigation spent much of their time with clean up. All bore locations are clean and irrigation breaks are repaired. The mainline connections between 2 and 8 along with 4 tee box have been completed. They have begun with excavation down the 8th hole with a 6 inch main that will end at the 7th tee box. My staff and I have dedicated a lot of time this week to plan the days and week ahead. Constant communication has been critical to this week's successes.