What a difference a day makes. The first picture was taken yesterday as the rain poured down. Today the digging was much cleaner. Granted they were in a different location, however things are always nicer when the sun is shining. The wet dig was in one of the lowest areas of the course. However the cleanup from this area looks fantastic. Jose and his crew are doing a great job with keeping the mainline areas clean.
The drier dig is impressive not just because it is clean but it is dry and the soil is in great condition. If you click on the picture and make it larger you will see very little rock. This trench is to the players right of the 8th green.
The goal is to be completed with mainline construction on holes 7 and 8 by Friday.