After a few raindrops began to fall, Jose and his team of guys acted quickly to cover up and continue to fuse the valve onto the mainline. It is critical that no water is on the pipe prior to fusion. According to manufacturer specifications the pipe needs to be lightly scraped, cleaned with 97% alcohol and completely dry before installing the lateral valve onto the main.
Working with this pipe needs careful attention and no steps can be missed.
The weather looks like it will clear up for the next few days which will be a welcomed change. The new pump station was installed today and the electrical will be installed tomorrow. I have a couple of more videos I hope to have loaded up soon.