Pictured here is another set of problems just waiting in the wings. Basically we have a 4 inch main, 6 inch main, 1 1/2 inch power conduit all crossing through the trench needed for the new mainline. LUI will have to cut the water mains to get the new one together. When cutting the old mainlines, it will temporarily cut water to the front nine holes.
Next week the new building for the pumphouse will be constructed. The plan is to have the pumps down for abut 8 hours for that construction. At that time, LUI will work to tie the pipes together. Doing this all in the same time line will be the challenge.
On a recent positive note, the weather is looking favorable for us. Cooler temperatures, high chance of rain and maybe some snow!