Beginning at 6.30 this morning the installation for the pump building has begun. As of 11.30 am the truck has been unloaded and panels have been put on a number of flat bed trucks to be carted to the site from the clubhouse. The crane is now en route back to the pump house area and will be unloading the wall panels. The panels next to the electric boxes will be installed first so that the electricity can be connected once again to the pump station. My goal is to have the ability to water again by 3pm. So far a little behind that schedule but things are going smooth, which at this point is more important.