Friday, April 17, 2009

The Foundation

What you are looking at is the soil profile of the pump house site. As you can see that red clayey and organic material on the bottom needed further excavation for the footings and the concrete pour. It is critical that we ensure the proper balance and structure for this building. The pump site is the heart of the irrigation system. Ultimately we'll have three 100 horsepower pumps operating this new system. New screened fill will be incorporated prior to pouring concrete.

No comments:

Post a Comment