Friday, April 10, 2009

Silt Fence


The first step to constructing a pump building in this area is to install silt fencing. This fence was installed today to prevent any contamination to the Gore Creek. Monday, we will have the area surveyed for excavation and begin to remove about 4 feet of soil. The soil will be screened on site to use in another location. Due to soil reports and the demand for the building, material will need to be imported prior to the concrete slab being poured. Soil tests will also be done throughout the excavation period to ensure the best results.