Sunday, December 5, 2010

Almost There...

The end is in sight. Yesterday by 10.30am both frames of 11 & 17 bridge were in place and they fit like a glove. To the left is the 17th being lowered into position. For video of the process, visit the video bar to the right of the page.


The 17th bridge has one slight addition, a domestic gas line, as you can see it hanging from the frame. Earlier in this project, the gas company had a problem with one of their valves on this line and it caused a small explosion. This is a supplemental line and since we are nearing the peak season for natural gas demand, XCel will begin the process of replacing that line on Tuesday. Not the greatest news with the weather, present snow and the fact we need to keep track of our new irrigation system. However, it is better than piling this on the spring.


I will have more information later this week with details of the new gas line installation. Yes, it will have some effect on our operations, however since we have spent time and money on this new bridge I feel more comfortable knowing everything with the gas line will be corrected to prevent another explosion.

As for the bridges, they are not operational yet. The railings and deck need to be secured before we allow use of the bridges. The first step is being done right now, as the metal floor is being welded onto the frame. Next, the railings will be installed and a temporary deck for the winter will be placed. Ultimately, a concrete deck will be poured as the permanent deck, but we have decided against pouring concrete this time of year. The concrete will be poured in April when the nordic season is over and nighttime temperatures are typically higher than December.

Our plan is to have the bridges operational by December 13th. Keep checking the blog for the latest details.