Tuesday morning, November 4th (Election Day). The 24" intake pipe was delivered along with all of our joints needed.

The concrete well is 6' in diameter and is 15 feet deep. There is about a 3 foot drop in elevation from the end of the pipe that sits in the pond to the well. The well has a 24" boot that the PVC C905 can fit into. We used about 70 feet of the C905 with joint restraints. The HDPE pipe came with a welded flange to attach to the PVC. (pictured above). The HDPE was placed in the water because it does not degrade from UV rays.