Wednesday, December 15, 2010

Bridge and Gas Line Update


The seventeenth bridge is coming along nicely and will be complete and ready for winter foot traffic for the weekend. You can see here, metal plates are being installed to keep the wood railings into place.

Excel energy started digging yesterday to install their new gas line. The goal is to replace the old line with the new line in the exact location.

The 4 inch line was fused onto the pipe from the bridge and about the first 50 feet was dug and installed yesterday. The trench was back filled by the end of the day so it would not freeze.

Thaw blankets have been installed for another 125 feet and the ground will be ready on Friday to continue the installation on the access road between 11 & 16 greens.

By the weekend, the 17th bridge will be safely accessible for all users. After the work on Friday is complete, the installation process will not pick up again until after the holidays. Which is fine with us, because the nordic activities are the busiest and there will be no interruptions through the season.

Saturday, December 11, 2010

The Final Touches on 11 Bridge


Today was the fun part. Plowing snow onto a perfectly good bridge. Mother Nature helped a bit, but we have spent the last few days moving snow with the front end loader from another site to the bridge. Due to the size of the bridge, we needed a lot of snow. The bridge is 15 feet wide and spans 44 feet in length.
Justin and Tony spent part of the morning getting the bridge into shape for skiers. By the end of the weekend it will be officially open.
Until the 17th bridge is operational, the 11th bridge will be used for skiers and foot traffic. Please obey signs. Keep it here for the completion of 17 bridge. Thanks to all of you for your patience and understanding.




Tuesday, December 7, 2010


So we are now embarking on our largest utility improvement project on the golf course. There are many utilities throughout the property including a power, phone, cable, high pressure gas and domestic (low pressure) gas. This next project is in response to a failed valve that caused an minor explosion to the domestic line prior to the 17th bridge excavation. The 4 inch line will be replaced starting this week. The first step is to thaw the ground. Today Xcel has installed a heating machine so that they can begin to dig on Friday.
They are installing the HDPE pipe all the way from the bridge to the frontage road, where it meets the high pressure line. This is a supplemental line for homes and part of Vail Village mostly used in the winter when the demand is greater.
They can thaw about 100 feet at a time. So it will be a slow process, but once they are complete, we can begin to open the area for winter activities.
The 17th bridge final preparations can be mostly accomplished from the south side of the creek, so they would not interfere with the gas company.

Monday, December 6, 2010

Railings


The design here is similar to the bridge detail on holes 14 & 15. A lighter and fresher color wood that will be changed on the aforementioned bridges to match our new established style in the future.
Today the guys are making quick work of the railings and hope to be completed by Wednesday. Transitioning the bridges will be the final step to allow the snowcat, snowmobile and skiers to access the bridge smoothly. We are focusing on protecting the rails and locating snow to bring to the bridge for skiing.

Sunday, December 5, 2010

Almost There...

The end is in sight. Yesterday by 10.30am both frames of 11 & 17 bridge were in place and they fit like a glove. To the left is the 17th being lowered into position. For video of the process, visit the video bar to the right of the page.


The 17th bridge has one slight addition, a domestic gas line, as you can see it hanging from the frame. Earlier in this project, the gas company had a problem with one of their valves on this line and it caused a small explosion. This is a supplemental line and since we are nearing the peak season for natural gas demand, XCel will begin the process of replacing that line on Tuesday. Not the greatest news with the weather, present snow and the fact we need to keep track of our new irrigation system. However, it is better than piling this on the spring.


I will have more information later this week with details of the new gas line installation. Yes, it will have some effect on our operations, however since we have spent time and money on this new bridge I feel more comfortable knowing everything with the gas line will be corrected to prevent another explosion.

As for the bridges, they are not operational yet. The railings and deck need to be secured before we allow use of the bridges. The first step is being done right now, as the metal floor is being welded onto the frame. Next, the railings will be installed and a temporary deck for the winter will be placed. Ultimately, a concrete deck will be poured as the permanent deck, but we have decided against pouring concrete this time of year. The concrete will be poured in April when the nordic season is over and nighttime temperatures are typically higher than December.

Our plan is to have the bridges operational by December 13th. Keep checking the blog for the latest details.

Saturday, December 4, 2010

Moving Bridges

From the moment I first laid eyes on the bridges on the golf course I knew that these aging structures needed to be replaced. Unfortunately they fell down the priority list behind a new irrigation system and some failing retaining walls. However, today is the day we begin with the final steps of the new large bridges on the 11th and 17h holes.
Pictured here are the bottom of the rails that have already been installed. Due to the schedule of the crane company, today will be when they are placed onto the abutments. Over the next week the railings and transitions to the bridge will be finalized. They will be available for the nordic community on December 13th.
The railings have been stained and prepared for all weather conditions. You will notice how nicely they match the wood detail of the pumphouse and the new weather shelter.

Tuesday, November 30, 2010

Weather Shelter Update

Today was barely warm enough to continue with framing the new weather shelter on the 11th hole. This shelter is located about 40 steps in the north east direction from the 11th green. It will cover that void in the middle of the course for anyone caught in a storm. It is accessible from holes 11,12,15,16 & 17.
When the framing is complete, only the roof remains. The roof and wood materials mirror the pumphouse building. There are no inside walls on the building, however there are trees and willows to the west of the building to help protect against the prevailing winds. Inside the building will be a circular bench for golfers to sit as they wait out the storm. The wood will be stained the appropriate color and the lightning protection is scheduled to be installed in the springtime.